Parking Lot Sealcoating in Sioux Falls, SD

Parking lot sealcoating is the same protective film used on driveways, applied at commercial scale to a lot's stalls, aisles and entrances, and in Sioux Falls it is part of keeping a lot in the condition the zoning code expects. Section 160.556 requires parking and drive areas to be hard-surfaced with concrete or asphalt and striped, kept as free as possible of snow and ice, and maintained in good condition. Lots here take more abuse than driveways: plow blades, piled snow, sand and delivery trucks all winter, then summer heat. A sealcoat every few years slows the oxidation and water damage that turn a lot gray, raveled and cracked, and gives new striping a clean surface to sit on.

Typical Sioux Falls price

$0.10 - $0.30 per sq ft at commercial scale · full pricing guide

The city's growth keeps adding lots. In 2025 alone Sioux Falls issued permits for 138 new commercial buildings, 80 of them apartment buildings, and the year-end report lists apartment projects of 124 and 178 units among the largest. Each new lot follows the same arc as a new driveway: a few months to cure, a first seal, then a maintenance cycle. Older lots are further along that arc and more often need crack sealing and patching before any sealcoat goes down.

Traffic in a lot is concentrated, so wear is uneven. SealMaster recommends a minimum of two coats over the whole surface and a third in high-traffic areas such as entrances and drive lanes, where turning tires scrub the film fastest. Its typical resealing interval is about three years, shorter in harsh winters and under heavy traffic. The sequence matches a driveway job: clean, fill cracks, repair potholes, prime oil spots at the heads of stalls, then seal.

Keeping a business open is the scheduling problem. Sealer needs at least 24 hours without traffic, so a lot that must stay open is done in sections, part of the stalls one day and the rest the next, with drive aisles kept open by rotation. SealMaster's weather rule, no sealer when temperatures will drop below 50 degrees within 24 hours or when rain is expected, narrows the calendar to roughly June through August here, when Foss Field's normal overnight low stays above 50. Striping goes down only after the final coat has cured, and line striping covers the layout and accessible spaces.

Two more code provisions matter when sealing. Section 160.556 requires lots to dispose of stormwater so that it does not flow onto adjoining property or sidewalks in a harmful way, and requires lots of more than 200 spaces or 32,300 square feet to be divided into smaller fields. Ponded areas are worth correcting before sealer goes down, because water that sits on a lot finds every crack, and island curbs and landscaped dividers add edge work. Wherever snow is piled all winter, the pile site stays wet into spring and deserves a close look for cracking. The cost page shows commercial per-foot rates.

Free quote

Fields marked * are required.

Fast response during business hours. No obligation.

Signs a Sioux Falls lot is due for sealcoat

Check the lot on a dry day in late spring, once the winter sand has been swept up.

  • Drive lanes and entrances have faded to gray while stall ends are still darker
  • Loose sand and small stones collect along curbs and in low spots
  • Stall lines have faded or chipped where plows scraped across them
  • Oil stains have softened the asphalt at the heads of stalls
  • Cracks have opened around catch basins and along curb lines
  • Water ponds in the same places after every rain

Sealcoat, repair first, or resurface

The right treatment depends on how much of the lot is still sound.

Sound, faded surface

Two coats of sealer with a third on drive lanes and entrances, followed by restriping, on a cycle of about three years.

Sound surface with cracks and potholes

Crack sealing and hot-mix patches first, then sealcoat and striping in the same season, phased so the lot stays partly open.

Broad cracking and failed areas

When damage covers a large share of the lot, a mill-and-overlay, the treatment the city gives worn streets after milling about 2 inches off, may be better value than repeated patching and sealing.

Owner questions

Parking Lot Sealcoating FAQs

How long does a freshly sealed lot have to stay closed?

Each section needs at least 24 hours without foot or vehicle traffic under SealMaster's guidance, and longer in cool or humid weather. A lot that has to stay open can be sealed in halves or thirds so part of the parking is always available. Striping follows only after the final coat has cured, which can add a day. A business with early opening hours can ask for evening starts, which let a section cure overnight, provided the overnight low stays above 50 degrees.

Does parking lot sealcoating need to be redone after every winter?

No. SealMaster's typical interval is about three years, with drive lanes and entrances wearing faster and sometimes needing a touch-up sooner. Winter wear here comes from plow blades, sand and piled snow, so a spring inspection after the thaw is worthwhile, but resealing a whole lot every year wastes material. Crack sealing, by contrast, deserves a look every year, because cracks keep opening through a winter with about 99 freeze-thaw days.

What does a lot need before it can be sealed?

A clean, dry, sound surface. That means sweeping and blowing off winter sand, scrubbing and priming oil spots in the stalls, filling cracks wider than a hairline, and patching potholes and failed areas with hot mix. New asphalt needs to cure first, and Angi's guidance is to wait at least three months. A lot paved in the fall therefore waits for the following summer before its first seal.